Keesler Medical Center

Biloxi, Mississippi

Hurricane Katrina gave this hospital the reason and the resources to upgrade its thirty-five-year-old, 18,000 square foot dietary department to bring it up and into the twenty-first century. Fortunately, because new equipment could be integrated into the existing utility infrastructure, the fast-track schedule was met to the satisfaction of the U.S. Army Corps of Engineers.

Related Work

Design

Kathleen Grimm School for Leadership and Sustainability

With the SOM team, HOPKINS designed the first net-zero school for the New York City School Construction Authority. Menu and operational changes supplemented highly efficient equipment specifications to help the school achieve its net-zero goal

Design

Food and Drug Administration

This Design Excellence project, won as a joint venture by The Kling Lindquist Partnership and RTKL in 1993, lasted for well over a decade. As the number of employees transferred into the facility grew to more than 6,000, so did the need for multiple food outlets, which today range in size from grab-n-goes to full-service cafeterias. The availability of five points of service keeps employees from traveling to local strip centers for lunch. The kitchen’s large catering area supports a full FDA event schedule.

Design

MIT, William Sloan School of Management

The Beyer Blinder Belle addition of a new penthouse floor, along with a complete gut-renovation of the Building E-52 conference center, will increase the number of events the building can host and the corresponding revenues gained. HOPKINS’ scope included renovation of a large production kitchen and a remote full-service bake shop, to which we added a third finishing kitchen on the penthouse level and catering pantries near all conference rooms.